西班牙瓦安装方式
Installation of Spanish tiles
今天光阳瓦业小瓦向您分享西班牙瓦的安装方法,一定要仔细听,很专业很高深。这是国家级别的施工师傅总结的经验。。
Today, Guangyang tile tile small tile to share with you the installation of Spanish tile, we must listen carefully, very professional and deep. This is the experience summed up by the national level construction master.
☼
Came in
安装前应根据现场屋面情况进行放线,这样有助于安装瓦时达到横平竖直,保证安装质量及达到美观效果。
Before the installation, we should place the line according to the roof condition, so that it can help to install the tile level to the level and vertical, ensure the installation quality and achieve the beautiful effect.
两坡屋面主瓦安装时,一侧波峰中心与CC1(CC2)或DD1(DD2)线重合,主瓦上、下部都应与CD、AB线平行,并从一侧(CC1或DD1线)开始安装。
When the main tile of two slope roof is installed, the peak center of one side is coincided with CC1 (CC2) or DD1 (DD2) line. The upper and lower parts of the main tile should be parallel to the CD and AB lines and begin to be installed from one side (CC1 or DD1 line).
西班牙瓦
Spanish Watt
☼
Came in
第一张西班牙瓦的安装最为重要,一定要保证瓦底边与CC1(CC2)或DD1(DD2)线垂直不得倾斜,位置摆正后,在最下端檩条和瓦的中心位置(波峰)处将瓦固定。为防止单向搭接造成的倾斜和不平整现象,主瓦横向安装要一上、一下排列,即第二张瓦扣压第一张瓦和第三张瓦,第四张瓦扣压第三张和第五张瓦并各搭接一个瓦波,其余以此类推。
The installation of the first Spanish tile is the most important. It is necessary to ensure that the bottom edge of the tile is not inclined vertically with CC1 (CC2) or DD1 (DD2) line, and the tile is fixed at the center position of the lower purlin and tile at the center position (wave peak). In order to prevent the incline and unevenness caused by one way lap joint, the lateral installation of the main tile should be arranged in one up and up, that is, second tiles and third tiles, fourth tiles and third and fifth tiles each to join one Wa Bo, and the rest of the other.
安装过程中要随时检查瓦底边与施工线的垂直,确认无误后再将固定件安装齐全。纵向安装要搭接西班牙瓦的一个节长。
At any time during installation, check the vertical line of the tile bottom and the construction line at any time, confirm the correct parts and install the fixings. The longitudinal installation should take a section length of Spanish tile.
☼
Came in
两坡屋面主瓦安装应两侧同步进行,以确保正脊瓦安装的波峰吻合。主瓦安装选用直径6.3mm、长度75mm的自攻钉;正脊瓦、斜脊瓦安装根据固定位置的不同,选用直径6.3mm,长度110-150mm的自攻钉。
Two slope roof tiles should be installed on both sides simultaneously, to ensure that the installation is ridge crest. The main tile is a self tapping pin with a diameter of 6.3mm and a length 75mm, and a self tapping nail with a diameter of 6.3mm and a length of 110-150mm is selected for the installation of the positive and oblique tiles according to the different fixed position.
固定瓦时先将防水圈置于保护垫下面的凹槽内,并将自攻钉穿过保护垫中心孔(弧面朝下),电钻要与瓦面垂直,紧固瓦时钉的松紧要适中,完毕后再安装防水帽。钢檩条采用自攻钉或不锈钢角钉,木檩条采用自攻螺丝。在需固定的波峰上先钻大于自攻螺丝直径2mm的孔,每隔一个波峰固定一套配件。
In the fixed tile, the waterproof ring is placed in the groove under the protective pad first, and the self tapping nail is passed through the center hole of the protective pad (the arc face downward). The electric drill should be perpendicular to the tile surface. The tightness of the fastening tile should be moderate, and the waterproof cap will be installed after the end. Steel purlin with self tapping screws or stainless steel nails, wood purlin by self tapping screws. On the fixed wave crest, we need to drill the hole which is bigger than the self tapping screw diameter 2mm, and fix a set of fittings every one wave crest. |